Construction for Vessels over 500 GT
National Institute of Aquatic Spaces
Naval Industry Management Office
Application Form
Approval of Project and Other Naval Construction Services
By means of this document, I hereby request an Inspection for NAVAL CONSTRUCTION PROJECT APPROVAL. To this end, I submit the documentation indicated on this form and declare the authenticity and veracity of the information provided:
COMPANY INFORMATION
| Name: | Tax ID: | Contact Phone Numbers: | ||||
| Address: | E-mail: | |||||
VESSEL OWNER OR SHIPOWNER DATA
| Name: | ID (C.I.) / Tax ID (RIF): | Contact Phone Numbers: | ||||
| Address: | E-mail: | |||||
NAVAL CONSTRUCTION DATA
| Name: | Model: | Material: | |||
| Intended Service: | |||||
| Length Overall (LOA): | Beam: | Depth: | |||
| Gross Tonnage: | Net Tonnage: | ||||
TYPE OF ACTIVITY
CONSTRUCTION AUTHORIZATION FOR VESSELS OVER 500 GRT (Gross Register Tonnage)
DOCUMENTATION TO BE SUBMITTED
| 1. | Letter addressed to the President of INEA making the respective request. | ☐ |
| 2. | Application form addressed to the President of the National Institute of Aquatic Spaces. | ☐ |
| 3. | Letter of commitment specifying the agreements between the parties (shipowner and Main Naval Production Center). | ☐ |
| 4. | Copy of the Identity Card (Cédula de Identidad) or RIF (taxpayer identification number) of the owner of the vessel to be constructed. | ☐ |
| 5. | ||
| 5.1. Project descriptive memory (technical specifications). ☐
5.2. Structural calculations. ☐ 5.3. Stability study under different loading conditions, hydrostatic curves, and cross curves of stability. ☐ 5.4. Lines plan (hull form plan). ☐ 5.5. General arrangement plan. ☐ 5.6. Capacity plan and table. ☐ 5.7. Structural plans of longitudinal sections. ☐ 5.8. Structural plans of the midship section and typical sections. ☐ 5.9. Structural plans of watertight bulkheads, including their openings. ☐ 5.10. Superstructure plans. ☐ 5.11. Plan of shaft lines, rudder, and rudder stock. ☐ 5.12. Structural plans of the shaft tunnel or stern tube. ☐ 5.13. Structural plan of the main deck with details of its hatches and closing systems. ☐ 5.14. Location plan for ventilation ducts exposed to the weather. ☐ 5.15. Location plan for sounding pipes and tank air vents. ☐ 5.16. Shell expansion and main deck plating plan. ☐ 5.17. Plans of different systems: bilge, fuel, propulsion, steering, drinking water, and sewage, among others. ☐ 5.18. Electrical system plans: includes details of emergency switchboards, main and secondary distribution, circuits, electrical balance, and power distribution. ☐ 5.19. Engine room general arrangement plan. ☐ 5.20. Tonnage calculation. ☐ 5.21. Load line calculation. ☐ 5.22. Range calculation (fuel capacity). ☐ 5.23. Characteristics of the propulsion engines and generator engines. ☐ 5.24. Detailed schedule of works to be executed. ☐ 5.25. Description of the standards applied during the construction process. ☐ 5.26. Protocol for stability tests, port trials, and sea trials. ☐ |
||
| 6. | Technical Data Sheet of the Naval Engineer responsible for the work. . |
☐ |
NOTE: All these requirements must be contained on a flash drive (pendrive) and sent to the Naval Industry Management Office (Gerencia de Industria Naval) at the INEA Headquarters in Caracas. Likewise, the documents in digital format (PDF) must be forwarded to the email addresses solicitudes_industrianaval@inea.gob.ve or recepcionindustrianaval@gmail.com and the physical folder must be filed at the Naval Production Center (Centro de Producción Naval).
|
Verified by: Position: Date: Signature: |
Applicant Name (Company/Owner/Shipowner): C.I./RIF: Signature: Applicant Company Seal/Stamp: |




